  • A fee for each mechanical permit shall be paid to the Building Official as set forth herein.
    1. Permit Issuance.
    A. For the issuance of each permit – $22.00
    B. For issuing each supplemental permit – $3.25
    2. Unit Fee Schedule.
    A. For the installation or relocation of each forced-air or gravity-type furnace or burner, including ducts and vents attached to such appliance, up to and including 100,000 Btu/h – $6.63.
    B. For the installation or relocation of each forced-air or gravity-type furnace or burner, including ducts and vents attached to such appliance over 100,000 Btu/h – $8.13.
    C. For the installation or relocation of each floor furnace, including vent – $6.63.
    D. For the installation or relocation of each suspended heater, recessed wall heater or floor-mounted unit heater – $6.63.
    E. For the installation, relocation or replacement of each appliance vent installed and not included in an appliance permit – $3.25.
    F. For the repair of, alteration of, or addition to each heating appliance, refrigeration unit, cooling unit, absorption unit, or each heating, cooling, absorption, or evaporative cooling system, including installation of controls regulated by this chapter – $6.13.
    G. For the installation or relocation of each boiler or compressor to and including three horsepower, or each absorption system to and including 100,000 Btu/h – $6.63.
    H. For the installation or relocation of each boiler or compressor over three horsepower to and including 15 horsepower or each absorption system over 100,000 Btu/h and including 500,000 Btu/h – $12.12.
    I. For the installation or relocation of each boiler or compressor over 15 horsepower to and including 30 horsepower, or each absorption system over 500,000 Btu/h to and including 1,000,000 Btu/h – $16.63.
    J. For the installation or relocation of each boiler or compressor over 30 horsepower to and including 50 horsepower, or for each absorption system over 1,000,000 Btu/h to and including 1,750,000 Btu/h – $24.75.
    K. For the installation or relocation of each boiler or refrigeration compressor over 50 horsepower, or each absorption system over 1,750,000 Btu/h – $41.38.
    L. For each air handling unit to and including 10,000 cubic feet per minute, including ducts attached thereto – $4.75. Note: This fee shall not apply to an air handling unit which is a portion of a factory assembled appliance, cooling unit, evaporative cooler or absorption unit for which a permit is required elsewhere in this chapter.
    M. For each air handling unit over 10,000 cfm – $8.08.
    N. For each evaporative cooler other than portable type – $4.75.
    O. For each ventilation fan connected to a single duct – $3.25.
    P. For each ventilation system which is not a portion of any heating or air conditioning system authorized by a permit – $4.75.
    Q. For the installation of each hood which is served by mechanical exhaust, including the ducts for such hood – $4.75.
    R. For the installation or relocation of each domestic type incinerator – $8.13.
    S. For the installation or relocation or each commercial or industrial type incinerator – $33.25.
    T. For each appliance or piece of equipment regulated by this chapter but not classed in other appliance categories, or for which no other fee is listed in this chapter – $4.25.
    U. Permit fees for fuel gas piping shall be as follows:
    (1) For each gas piping system of one to four outlets – $2.75;